Summarize project facts
Record property, suite or strata context, current evidence, planned loads, selected option and utility-owned work assumptions.
Approval responsibility map
Assign qualified contractor, TSBC permit and inspection, BC Hydro service, City or building, outage and closeout steps.
Decision file
Record property, suite or strata context, current evidence, planned loads, selected option and utility-owned work assumptions.
Use current Technical Safety BC requirements and legal names; keep a dated verification record tied to proposed scope.
Ask who obtains the permit, inspections required, correction process and closeout documents.
Separate application, design, customer prerequisites, meter or service work, outage and scheduling.
Record suite, EV, fire separation, structural penetration, excavation, restoration and strata questions.
Log source, date, project facts, answer, required document, responsible party and what must happen next.
Maintain separate columns for Technical Safety BC, BC Hydro and City or building decisions, each with project facts, responsible party, submission, prerequisite and response. This prevents a permit answer from being mistaken for utility approval.
Record the proposing legal name against current TSBC information and define who obtains the electrical permit, arranges inspections, corrects deficiencies and supplies closeout. Keep the evidence tied to the accepted scope.
Use current BC Hydro service-connection information to map application, design, customer work, readiness, outage, meter and energization steps. Confirm requirements and schedule for the actual address before ordering equipment or promising dates.
Maintain distinct Technical Safety BC, BC Hydro and Surrey or building columns with identical project facts, current source, checked date, reference, responsible party, prerequisites and next action. Add contractor legal-name evidence, permit and inspection, utility application and design, customer readiness, outage, meter or energization and relevant strata or construction interfaces. Conditional answers remain open, and scope changes trigger recheck. The roadmap assigns process ownership without promising timing or approval and prevents one organization’s response from being applied to work controlled by another. Review the roadmap at every submission and readiness milestone, recording the document that actually closed each dependency. Preserve changed utility or authority instructions with their effective dates and affected drawing revision.
Primary references
Links checked in the approved research packet on August 26, 2026. Applicability still depends on the property and proposed scope.