Use one capacity basis
Confirm every proposal uses the same load inventory, project sequence, calculation and service evidence.
Proposal normalizer
Normalize load evidence, panel or service, management, utility, permits, access, outages, restoration, exclusions and records.
Decision file
Confirm every proposal uses the same load inventory, project sequence, calculation and service evidence.
Identify panel, service, management, EV distribution, suite or building work and alternatives.
List model, rating, compatibility, listed accessories, settings and substitution rules.
Compare applications, fees, permits, inspections, customer prerequisites, outage and schedule dependencies.
Include electrical-room coordination, routes, trenching, fire stopping, patching, labels and cleanup.
Require evidence for unknowns, written authorization, inspections, settings, tests, labels and owner records.
Provide the same service evidence, load calculation, project queue, EV route and building context to every proposer. Require deviations to be written so price differences can be traced to equipment or scope instead of hidden assumptions.
List panel, breakers, service equipment, management controls, charger interfaces, conductors, meter components, labels and settings. Add trenching, penetrations, fire stopping, patching and strata logistics with named responsibility.
Compare TSBC permit and inspection, BC Hydro, City and strata tasks, fees and dependencies, then define notice and pricing for changes. Require final calculations, labels, tests, settings, inspection and utility evidence, manuals and warranties.
Provide one service-evidence set, load calculation, project sequence, EV route and building context. Compare exact panel, service, management and charger equipment; utility, TSBC, City and strata tasks; outage, trenching, fire stopping and restoration; and final labels, tests, settings and records. Separate alternatives, allowances and exclusions. Define evidence, notice, review, price and written authorization for changes, then carry clarifications into the contract. The ledger exposes unlike capacity assumptions and prevents an ampere rating or equipment package from standing in for a complete approved project scope. Hold a final comparison meeting using the approved project sequence and dependency roadmap. Resolve unlike calculation, utility, outage and restoration assumptions, then incorporate the relied-on answers into the accepted contract and owner file.
Primary references
Links checked in the approved research packet on August 26, 2026. Applicability still depends on the property and proposed scope.